MEGIN RUX

LEAD ARCHITECT & TENANT FINISH DESIGNER
PRINCIPAL ARCHITECT AT MBX ARCHITECTURE

Megin Rux has over twelve years of experience in architecture and design in southern Wyoming and northern Colorado. She is passionate about community focused, innovative design, and sustainability. Her extensive experience with different building types allows her to take on a spectrum of project industrial buildings and customized office spaces. After a decade in the field, Megin founded MBX Architecture and is dedicated to providing excellent design for every aspect of the project.

REGISTRATIONS:
Licensed Architect in Wyoming & Colorado

EDUCATION:
Masters of Architecture: University of Kansas. May 2009
Bachelor of Fine Arts with Honors: University of Wyoming Spring 2003

PROFESSIONAL AFFILIATIONS:
Museum of Art Fort Collins, Board Member, 2016-2022
AIA Colorado Infill Task Force, Event Organizer 2017
Cheyenne Historic Preservation Board Member, 2013-2016
YAF Emerging Professions Organizer, 2012-2016
Fridays in the Hynds Board Member, 2015-2016
AIA of Wyoming: Chair of Communications Committee, 2011-2013

APPLICABLE EXPERIENCE:

Saddle Ridge Multifamily - Phase 2 Cheyenne WY: Design 2022, Construction 2023-2024.
Luxury 116 apartment unit complex consisting of six buildings. 30 Million Dollar project. CMAR delivery method. Role: project manager/ Architect of Record.

Saddle Ridge Multifamily - Phase 1 Cheyenne WY: Design 2021, Construction 2022-2023.
A large scale 104 apartment unit multifamily complex with leasing office and picnic structure. 23 Million Dollar project. CMAR delivery method. Role: project manager/Architect of Record.

Champion X Office and Warehouse Kersey CO: Design 2022-2023, Construction 2023-2024.
The Champion X Office and Warehouse is industrial level office and warehouse, designed to accommodate large fluctuating staffing numbers throughout the day as shifts change. Role: Principal/Architect of Record.

TBC Manufacturing Headquarters Building Cheyenne WY: Design 2020, Construction 2020-2021 .
A 17,000 square foot innovative custom metal design and fabrication facility. CMAR delivery method. Role: Project Manager *

Searing Manufacturing Building Cheyenne WY: Design 2016-2017, Construction 2017.
An 118,000 square foot addition to the existing 256,000 square foot custom steel tube manufacture facility. Required extensive coordination with existing systems, structure and train tracks that went through the facility. Role: Project Manager *

Alexis Drake R & D Warehouse Cheyenne WY: Design 2022, Construction 2022-2023.
Renovated an historic garage into a state-of-the-art Research and Development, and laser cutter production to provide in-house leather cutting for the Alexis Drake leather line of goods manufactured in Cheyenne. CMAR delivery method. Role: Principal/Architect of Record.

Sweetgrass Office Building Cheyenne, WY: Design 2020, Construction 2021.
New “modern farmhouse” office building designed to accommodate the needs of a high-tech office and retail space. CMAR delivery method. Role: Principal/Architect of Record.

Next Door Rustic Reality Cheyenne WY Design 2020, Constructions 2021.
Adaptive reuse of a church into a contemporary open office and lounge. CMAR delivery method. Role: Principal/Architect of Record.

416 S 3rd Office Renovation Laramie, WY: Design 2020.
Conceptual design for the renovation of the building into new offices, includes new outdoor space. Role: Principal/Architect of Record.

West Edge Collective Cheyenne, WY: Design 2017, Construction 2018.
New office building using reused bridge girders, shipping containers, and a VW Van to achieve dynamic work environment. The facade is designed as a canvas for murals. CMAR delivery method. Role: Principal/Architect of Record. *

* Worked on project at a previous firm